TABLE OF CONTENTS                                                                                                                                                 Page

 

Executive SUMMARY

 

1.0

INTRODUCTION

1

 

 

 

2.0

PROJECT INFORMATION

 

 

2.1 Background

1

 

2.2 Site Description

2

 

2.3 Construction Programme

2

 

2.4 Project Organization and Management Structure Milestones of Environmental Protection / Mitigation activities annotated

2

 

2.5 Contact Details of Key Personnel

 

 

 

 

3.0

Construction Progress during the monitoring period

2 – 3

 

 

 

4.0

Air Quality Monitoring

 

 

4.1 Monitoring Requirement

4

 

4.2 Monitoring Equipment

4

 

4.3 Monitoring Parameters, Frequency and Duration

4

 

4.4 Monitoring Locations

4

 

4.5 Action and Limit Levels

4

 

4.6 Event-Action Plans

4

 

4.6 Results

5

 

 

 

5.0

Impact Noise Monitoring

 

 

5.1 Monitoring Requirements

5

 

5.2 Monitoring Equipment

5 – 66

 

5.3 Monitoring Parameters, Frequency and Duration

676

 

5.4 Monitoring Locations

6 – 6

 

5.5 Action and Limit Levels

6

 

5.6 Event-Action Plans

68

 

5.7 Results

7 – 9

 

 

 

6.0

Water quality monitoring

79

 

 

 

7.0

environmental Non-conformance

 

 

7.1 Summary of air quality, noise and water quality monitoring

89

 

7.2 Summary of Environmental Complaints

8

 

7.3 Summary of Notification of Summons and Prosecution

8

 

 

 

8.0

Site Inspection

8

 

 

 

9.0

Status of Environmental permits and submissions

8 – 9

 

 

 

10.0

Waste Management

 

 

10.1 Waste Management Audit

101

 

10.2 Summary of Quantities of Waste generated during the Construction period

10 1

 

 

 

11.0

Implementation Status

 

 

11.1 Implementation Status of Environmental Mitigation Measures

10 – 111 – 12

 

11.2 Implementation Status of Event and Action Plan

112

 

11.3 Implementation Status of Environmental Complaint Handling

11 – 132

 

11.4 Implementation Status of Notification of Summons and Prosecution

13 – 14

 

 

 

12.0

Review of environmental monitoring methodology

14

 

 

 

13.0

Review of validity of eia predictions, effectiveness of the final eia rrocess and em&a programme

15

 

 

 

14.0

Conclusion

152

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

APPENDIX

 

A

Organization Chart and Lines of Communication

 

B

Graphical Plots of Impact Air Quality Monitoring Data

 

C

Graphical Plots of Impact Noise Monitoring Data

 

D

Data of Weather Station

 

E

Event-Action Plans

 

F

Construction Programme

 

 

 

 

 

 

 

Figures

 

Drawing No. 23400/EN/098

Ngong Ping Sewage Project Scheme – General Layout

Drawing No. 23400/T/069

Effluent Export Pipeline: General Layout Plan

Drawing No. 23400/T/201

General Site Layout

Drawing No. 23400/R/004

Air & Noise Sensitive Receivers around Ngong Ping Area

Drawing No. 23400/EN/094

Locations of Noise and Dust Monitoring Stations

 

 

 

 

 

Tables

 

2.1

Contact Details of Key Personnel

3.1

Monthly Construction Activities during the monitoring period

4.1

Air Quality Monitoring Equipment

4.2

Monitoring parameters, duration and frequency of impact air quality monitoring

4.3

Air Quality Monitoring Locations

4.4

Action and Limit Levels for 24-hr TSP and 1-hr TSP (Please include the date of monitoring in the x-axis of the charts)

4.5

Summary of Air Quality Exceedances in the reporting period

5.1

Noise Monitoring Equipment

5.2

Duration, Frequencies and Parameters of Noise Monitoring

5.3

Noise Monitoring Locations

5.4

Action and Limit levels for noise monitoring

5.5

Summary of Exceedances of Noise Monitoring during the reporting period

9.1

Summary of Environmental Licensing and Permit Status

9.2

Summary of the Document Submission to the Engineer’s Representative (ER)

10.1

Summary of Quantities of Waste for Disposal during the monitoring period

10.2

Summary of Quantities of Waste for Recycling during the monitoring period

11.1

Statistical Summary of Environmental Complaints

11.2

Statistical Summary of Notification of Summons and Prosecutions