

TABLE
OF CONTENTS Page
|
1.0 |
1 |
|
|
|
|
|
|
2.0 |
|
|
|
|
2.1 Background |
1 |
|
|
2.2 Site Description |
2 |
|
|
2.3 Construction
Programme |
2 |
|
|
2.4 Project Organization and Management Structure |
2 |
|
|
2.5
Contact Details of Key Personnel |
|
|
|
|
|
|
3.0 |
2 3 |
|
|
|
|
|
|
4.0 |
|
|
|
|
4.1 Monitoring
Requirement |
4 |
|
|
4.2 Monitoring
Equipment |
4 |
|
|
4.3 Monitoring
Parameters, Frequency and Duration |
4 |
|
|
4.4 Monitoring
Locations |
4 |
|
|
4.5 Action and Limit
Levels |
4 |
|
|
4.6 Event-Action
Plans |
4 |
|
|
4.6 Results |
5 |
|
|
|
|
|
5.0 |
|
|
|
|
5.1 Monitoring
Requirements |
5 |
|
|
5.2 Monitoring
Equipment |
5 6 |
|
|
5.3 Monitoring
Parameters, Frequency and Duration |
6 |
|
|
5.4 Monitoring
Locations |
|
|
|
5.5 Action and Limit
Levels |
6 |
|
|
5.6 Event-Action
Plans |
6 |
|
|
5.7 Results |
7 |
|
|
|
|
|
6.0 |
7 |
|
|
|
|
|
|
7.0 |
|
|
|
|
7.1 Summary of air
quality, noise and water quality monitoring |
8 |
|
|
7.2 Summary of
Environmental Complaints |
8 |
|
|
7.3 Summary of
Notification of Summons and Prosecution |
8 |
|
|
|
|
|
8.0 |
8 |
|
|
|
|
|
|
9.0 |
8
9 |
|
|
|
|
|
|
10.0 |
|
|
|
|
10.1 Waste
Management Audit |
10 |
|
|
10.2 Summary of
Quantities of Waste generated during the Construction period |
10 |
|
|
|
|
|
11.0 |
|
|
|
|
11.1 Implementation
Status of Environmental Mitigation Measures |
10 11 |
|
|
11.2 Implementation
Status of Event and Action Plan |
11 |
|
|
11.3 Implementation
Status of Environmental Complaint Handling |
11 13 |
|
|
11.4 Implementation Status of
Notification of Summons and Prosecution |
13 14 |
|
|
|
|
|
12.0 |
14 |
|
|
|
|
|
|
13.0 |
Review of validity of eia predictions, effectiveness of the final
eia rrocess and em&a programme |
15 |
|
|
|
|
|
14.0 |
15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
APPENDIX |
|
|
|
A |
|
|
|
B |
|
|
|
C |
|
|
|
D |
|
|
|
E |
|
|
|
F |
|
|
|
|
|
|
|
|
|
|
Drawing No. 23400/EN/098 |
Ngong Ping Sewage Project Scheme General
Layout |
|
Drawing No. 23400/T/069 |
Effluent Export Pipeline: General Layout Plan |
|
Drawing No. 23400/T/201 |
General Site Layout |
|
Drawing No. 23400/R/004 |
Air & Noise Sensitive Receivers around
Ngong Ping Area |
|
Drawing No. 23400/EN/094 |
Locations of Noise and Dust Monitoring
Stations |
|
|
|
|
Tables |
|
|
2.1 |
Contact Details of Key Personnel |
|
3.1 |
Monthly Construction Activities during the
monitoring period |
|
4.1 |
Air Quality Monitoring Equipment |
|
4.2 |
Monitoring parameters, duration and frequency
of impact air quality monitoring |
|
4.3 |
Air Quality Monitoring Locations |
|
4.4 |
Action and Limit Levels for 24-hr TSP and 1-hr
TSP |
|
4.5 |
Summary of Air Quality Exceedances in the
reporting period |
|
5.1 |
Noise Monitoring Equipment |
|
5.2 |
Duration, Frequencies and Parameters of Noise
Monitoring |
|
5.3 |
Noise Monitoring Locations |
|
5.4 |
Action and Limit levels for noise monitoring |
|
5.5 |
Summary of Exceedances of Noise Monitoring
during the reporting period |
|
9.1 |
Summary of Environmental Licensing and Permit
Status |
|
9.2 |
Summary of the Document Submission to the
Engineers Representative (ER) |
|
10.1 |
Summary of Quantities of Waste for Disposal
during the monitoring period |
|
10.2 |
Summary of Quantities of Waste for Recycling
during the monitoring period |
|
11.1 |
Statistical Summary of Environmental
Complaints |
|
11.2 |
Statistical Summary of Notification of Summons
and Prosecutions |
|
|
|