TABLE OF CONTENTS

 

Executive SUMMARY

 

1.0

INTRODUCTION

1

 

 

 

2.0

PROJECT INFORMATION

 

 

2.1 Background

1

 

2.2 Site Description

1 – 2

 

 

 

3.0

Baseline Odour Monitoring

 

 

3.1 Monitoring Requirement

2

 

3.2 Monitoring Parameters

2

 

3.3 Monitoring Equipment and Methods

2

 

3.4 Monitoring Locations

2

 

3.5 Monitoring Frequency and Duration

3

 

3.6 Results and Observations

3

 

3.7 Action and Limit Level

3 – 4

 

 

 

4.0

Revision for inclusion in the updated em&a manual

4

 

 

 

5.0

CONCLUSION

4

 

 

 

 

 

 

 

 

 

 

 

 

APPENDIX

 

A

Baseline Odour Monitoring Results

 

B

Certificate of Instrument Calibration

 

 

 

 

 

Figure

 

Figure 1

Odour monitoring location for the Ngong Ping Sewage Treatment Plant

23400/EN/098

General layout plan of the project

23400/EN/010 to 23400/EN/018

The Portion of site and work area

 

 

 

Tables

 

3.1

Odour monitoring locations at NPSTP

3.2

Summary of baseline odour monitoring results

3.3

The criteria of Action and Limit Level for Operational Phase Odour Monitoring

3.4

Action and Limit Levels for Operational Phase Odour Monitoring