

Page
TABLE OF CONTENTS
|
1.0 |
1 |
|
|
|
|
|
|
2.0 |
|
|
|
|
2.1 Background |
1 |
|
|
2.2 Site Description |
1 – 2 |
|
|
|
|
|
3.0 |
|
|
|
|
3.1 Monitoring
Requirement |
2 |
|
|
3.2 Monitoring
Parameters |
2 |
|
|
3.3 Monitoring
Equipment and Methods |
2 |
|
|
3.4 Monitoring
Locations |
2 |
|
|
3.5 Monitoring
Frequency and Duration |
3 |
|
|
3.6 Results and
Observations |
3 |
|
|
3.7 Action and Limit
Level |
3 – 4 |
|
|
|
|
|
4.0 |
4 |
|
|
|
|
|
|
5.0 |
4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
APPENDIX |
|
|
|
A |
|
|
|
B |
|
|
|
|
|
|
Figure 1 |
Odour monitoring
location for the Ngong Ping Sewage Treatment Plant |
|
23400/EN/098 |
General layout plan of the project |
|
23400/EN/010 to
23400/EN/018 |
The Portion of site and work area |
|
Tables |
|
|
3.1 |
Odour monitoring
locations at NPSTP |
|
3.2 |
Summary of baseline
odour monitoring results |
|
3.3 |
The criteria of
Action and Limit Level for Operational Phase Odour Monitoring |
|
3.4 |
Action and Limit
Levels for Operational Phase Odour Monitoring |