TABLE OF CONTENTS Page
|
1.0 |
1 |
|
|
|
|
|
|
2.0 |
|
|
|
|
2.1 Background |
1 |
|
|
2.2 Site Description |
2 |
|
|
2.3 Construction
Programme |
2 |
|
|
2.4 Project Organization and Management Structure |
2 |
|
|
2.5
Contact Details of Key Personnel |
|
|
|
|
|
|
3.0 |
2 |
|
|
|
|
|
|
4.0 |
|
|
|
|
4.1 Monitoring
Requirement |
2 |
|
|
4.2 Monitoring
Equipment |
3 |
|
|
4.3 Monitoring
Parameters, Frequency and Duration |
3 |
|
|
4.4 Monitoring
Locations and Schedule |
3 – 4 |
|
|
4.5 Monitoring
Methodology |
4 – 5 |
|
|
4.6 Action and Limit
Levels |
5 |
|
|
4.7 Event-Action
Plans |
|
|
|
4.8 Results |
6 |
|
|
|
|
|
5.0 |
|
|
|
|
5.1 Monitoring
Requirements |
6 |
|
|
5.2 Monitoring
Equipment |
6 |
|
|
5.3 Monitoring
Parameters, Frequency and Duration |
6 |
|
|
5.4 Monitoring
Locations and Period |
|
|
|
5.5 Monitoring Methodology |
|
|
|
5.6 Action and Limit
Levels |
8 |
|
|
5.7 Event-Action
Plans |
8 |
|
|
5.8 Results |
8 |
|
|
|
|
|
6.0 |
8 – 9 |
|
|
|
|
|
|
7.0 |
|
|
|
|
7.1 Summary of air
quality, noise and water quality monitoring |
9 |
|
|
7.2 Summary of
Environmental Complaints |
9 |
|
|
7.3 Summary of
Notification of Summons and Prosecution |
9 |
|
|
|
|
|
8.0 |
9 |
|
|
|
8.1 Summary of the
site inspection findings and Action(s) taken by KLKJV and ET |
9 – 10 |
|
|
8.2 Status of
Environmental Permits and Submissions |
11 |
|
|
8.3 Recommendations
on site inspection findings in Site Inspections of this month |
1 |
|
|
|
|
|
9.0 |
|
|
|
|
9.1 Waste Management
Audit |
11 |
|
|
9.2 Records of Waste
Quantities |
12 |
|
|
|
|
|
10.0 |
|
|
|
|
10.1 Implementation
Status of Environmental Mitigation Measures |
12 |
|
|
10.2 Implementation
Status of Event and Action Plan |
12 |
|
|
10.3 Implementation
Status of Environmental Complaint Handling |
12 – 14 |
|
|
10.4 Implementation Status
of Notification of Summons and Prosecution |
15 |
|
|
|
|
|
11.0 |
15 |
|
|
|
|
|
|
12.0 |
|
|
|
|
12.1 Upcoming
EM&A Schedule in coming two months |
15 |
|
|
12.2 Upcoming
construction works schedule in the coming months |
15 |
|
|
|
|
|
APPENDIX |
|
|
|
A |
|
|
|
B1 |
Calibration Certificates
for Impact Air Quality Monitoring Equipment |
|
|
B2 |
|
|
|
B3 |
|
|
|
C1 |
Calibration Certificates
for Impact Noise Monitoring Equipment |
|
|
C2 |
|
|
|
C3 |
|
|
|
D |
|
|
|
E |
|
|
|
F |
|
|
|
G |
Summary of Implementation
Status of Mitigation Measures during Site Inspection |
|
|
H |
Wastewater Monitoring -
Test Report Wastewater Sample from Discharge Point |
|
|
|
|
|
|
|
|
|
Drawing No. 23400/EN/098 |
Ngong Ping Sewage Project Scheme – General
Layout |
|
Drawing No. 23400/T/069 |
Effluent Export Pipeline: General Layout Plan |
|
Drawing No. 23400/T/201 |
General Site Layout |
|
Drawing No. 23400/R/004 |
Air & Noise Sensitive Receivers around
Ngong Ping Area |
|
Drawing No. 23400/EN/094 |
Locations of Noise and Dust Monitoring
Stations |
|
|
|
|
Tables |
|
|
2.1 |
Contact Details of Key Personnel |
|
4.1 |
Air Quality Monitoring Equipment |
|
4.2 |
Monitoring parameters, duration and frequency
of impact air quality monitoring |
|
4.3 |
Air Quality Monitoring Locations |
|
4.4 |
Monitoring Schedule for air quality monitoring
stations |
|
4.5 |
Action and Limit Levels for 24-hr TSP and 1-hr
TSP |
|
5.1 |
Noise Monitoring Equipment |
|
5.2 |
Duration, Frequencies and Parameters of Noise
Monitoring |
|
5.3 |
Noise Monitoring Locations |
|
5.4 |
Monitoring Periods for noise monitoring
stations |
|
5.5 |
Action and Limit levels for noise monitoring |
|
8.1 |
The summary of the site inspection findings and
Action(s) taken by KLKJV and ET |
|
8.2 |
Summary of Environmental Licensing and Permit
Status |
|
8.3 |
Summary of the Document Submission to the
Engineer’s Representative (ER) |
|
9.1 |
Summary of Quantities of Waste for Disposal in
this reporting month |
|
9.2 |
Summary of Quantities of Waste for Recycling
in this reporting month |
|
10.1 |
Statistical Summary of Environmental
Complaints |
|
12.1 |
Upcoming EM&A Schedule in coming two
months |
|
12.2 |
Construction Plan in the coming months |
|
|
|