TABLE OF
CONTENTS Page
|
1.0 |
1 |
|
|
|
|
|
|
2.0 |
|
|
|
|
2.1 Background |
1 |
|
|
2.2 Site Description |
2 |
|
|
2.3 Construction Programme |
2 |
|
|
2.4 Project Organization and Management Structure |
2 |
|
|
2.5 Contact Details of Key Personnel |
|
|
|
|
|
|
3.0 |
2 |
|
|
|
|
|
|
4.0 |
|
|
|
|
4.1 Monitoring Requirement |
2 |
|
|
4.2 Monitoring Equipment |
3 |
|
|
4.3 Monitoring Parameters, Frequency and Duration |
3 |
|
|
4.4 Monitoring Locations and Schedule |
3 – 4 |
|
|
4.5 Monitoring Methodology |
4 – 5 |
|
|
4.6 Action and Limit Levels |
5 |
|
|
4.7 Event-Action Plans |
6 |
|
|
4.8 Results |
6 |
|
|
|
|
|
5.0 |
|
|
|
|
5.1 Monitoring Requirements |
6 |
|
|
5.2 Monitoring Equipment |
6 |
|
|
5.3 Monitoring Parameters, Frequency and Duration |
7 |
|
|
5.4 Monitoring Locations and Period |
7 |
|
|
5.5 Monitoring Methodology |
7 – 8 |
|
|
5.6 Action and Limit Levels |
8 |
|
|
5.7 Event-Action Plans |
8 |
|
|
5.8 Results |
8 – 9 |
|
|
|
|
|
6.0 |
9 |
|
|
|
|
|
|
7.0 |
|
|
|
|
7.1 Summary of air quality, noise and water quality monitoring |
9 |
|
|
7.2 Summary of Environmental Complaints |
9 |
|
|
7.3 Summary of Notification of Summons and Prosecution |
9 |
|
|
|
|
|
8.0 |
9 |
|
|
|
8.1 Summary of the site inspection findings and Action(s) taken
by KLKJV and ET |
9 – 11 |
|
|
8.2 Status of Environmental Permits and Submissions |
11 |
|
|
8.3 Recommendations on site inspection findings in Site
Inspections of this month |
12 |
|
|
|
|
|
9.0 |
|
|
|
|
9.1 Waste Management Audit |
12 |
|
|
9.2 Records of Waste Quantities |
12 |
|
|
|
|
|
10.0 |
|
|
|
|
10.1 Implementation Status of Environmental Mitigation Measures |
12 – 13 |
|
|
10.2 Implementation Status of Event and Action Plan |
13 |
|
|
10.3 Implementation Status of Environmental Complaint Handling |
13 – 14 |
|
|
10.4 Implementation Status of Notification of Summons and
Prosecution |
14 |
|
|
|
|
|
11.0 |
14 |
|
|
|
|
|
|
12.0 |
|
|
|
|
12.1 Upcoming EM&A Schedule in coming two months |
14 |
|
|
12.2 Upcoming construction works schedule in the coming months |
15 |
|
|
|
|
|
|
|
|
|
APPENDIX |
|
|
|
A |
|
|
|
B1 |
Calibration Certificates for Impact Air
Quality Monitoring Equipment |
|
|
B2 |
|
|
|
B3 |
|
|
|
C1 |
Calibration Certificates for Impact Noise
Monitoring Equipment |
|
|
C2 |
|
|
|
C3 |
|
|
|
D |
|
|
|
E |
|
|
|
F |
|
|
|
G |
Summary of Implementation Status of
Mitigation Measures during Site Inspection |
|
|
|
|
|
|
|
|
|
Drawing No. 23400/EN/098 |
Ngong Ping Sewage Project Scheme – General Layout |
|
Drawing No. 23400/T/069 |
Effluent Export Pipeline: General Layout Plan |
|
Drawing No. 23400/T/201 |
General Site Layout |
|
Drawing No. 23400/R/004 |
Air & Noise Sensitive Receivers around Ngong Ping Area |
|
Drawing No. 23400/EN/094 |
Locations of Noise and Dust Monitoring Stations |
|
|
|
|
Tables |
|
|
2.1 |
Contact Details of Key Personnel |
|
4.1 |
Air Quality Monitoring Equipment |
|
4.2 |
Monitoring parameters, duration and frequency of impact air
quality monitoring |
|
4.3 |
Air Quality Monitoring Locations |
|
4.4 |
Monitoring Schedule for air quality monitoring stations |
|
4.5 |
Action and Limit Levels for 24-hr TSP and 1-hr TSP |
|
5.1 |
Noise Monitoring Equipment |
|
5.2 |
Duration, Frequencies and Parameters of Noise Monitoring |
|
5.3 |
Noise Monitoring Locations |
|
5.4 |
Monitoring Periods for noise monitoring stations |
|
5.5 |
Action and Limit levels for noise monitoring |
|
8.1 |
The summary of the site inspection findings and Action(s) taken
by KLKJV and ET |
|
8.2 |
Summary of Environmental Licensing and Permit Status |
|
8.3 |
Summary of the Document Submission to the Engineer’s
Representative (ER) |
|
9.1 |
Summary of Quantities of Waste for Disposal in this reporting
month |
|
10.1 |
Statistical Summary of Environmental Complaints |
|
12.1 |
Upcoming EM&A Schedule in coming two months |
|
12.2 |
Construction Plan in the coming months |