

Page
TABLE OF CONTENTS
|
INTRODUCTION |
1 |
|
|
|
|
|
|
PROJECT INFORMATION |
|
|
|
|
2.1 Background |
1 |
|
|
2.2 Site Description |
2 |
|
|
2.3 Construction
Programme |
2 |
|
|
2.4 Project
Organization and Management Structure |
2 |
|
|
2.5 Contact Details
of Key Personnel |
|
|
|
|
|
|
Construction
Progress in this reporting Month |
2 |
|
|
|
|
|
|
Air
Quality Monitoring |
|
|
|
|
4.1 Monitoring
Requirement |
2 – 3 |
|
|
4.2 Monitoring
Equipment |
3 |
|
|
4.3 Monitoring
Parameters, Frequency and Duration |
3 |
|
|
4.4 Monitoring
Locations and Schedule |
3 – 4 |
|
|
4.5 Monitoring
Methodology |
4 – 5 |
|
|
4.6 Action and Limit
Levels |
5 – 6 |
|
|
4.7 Event-Action
Plans |
6 |
|
|
4.8 Results |
6 |
|
|
|
|
|
Impact
Noise Monitoring |
|
|
|
|
5.1 Monitoring
Requirements |
6 |
|
|
5.2 Monitoring
Equipment |
6 |
|
|
5.3 Monitoring
Parameters, Frequency and Duration |
7 |
|
|
5.4 Monitoring
Locations and Period |
7 |
|
|
5.5 Monitoring Methodology |
7 – 8 |
|
|
5.6 Action and Limit
Levels |
8 |
|
|
5.7 Event-Action
Plans |
8 |
|
|
5.8 Results |
8 – 9 |
|
|
|
|
|
Water quality monitoring |
9 |
|
|
|
|
|
|
environmental
Non-conformance |
|
|
|
|
7.1 Summary of air
quality, noise and water quality monitoring |
9 |
|
|
7.2 Summary of
Environmental Complaints |
9 |
|
|
7.3 Summary of
Notification of Summons and Prosecution |
9 |
|
|
|
|
|
Site
Inspection |
9 |
|
|
|
8.1 Summary of the
site inspection findings and Action(s) taken by KLKJV and ET |
9 – 12 |
|
|
8.2 Status of
Environmental Licensing and Permitting |
12 |
|
|
8.3 Recommendations
on site inspection findings in Site Inspections of this month |
12 |
|
|
|
|
|
Waste
Management |
|
|
|
|
9.1 Waste Management
Audit |
13 |
|
|
9.2 Records of Waste
Quantities |
13 |
|
|
|
|
|
Implementation
Status |
|
|
|
|
10.1 Implementation
Status of Environmental Mitigation Measures |
13 |
|
|
10.2 Implementation
Status of Event and Action Plan |
13 – 14 |
|
|
10.3 Implementation
Status of Environmental Complaint Handling |
14 |
|
|
|
|
|
Conclusion |
14 |
|
|
|
|
|
|
Future
Key Issues |
|
|
|
|
12.1 Upcoming
EM&A Schedule in coming two months |
14 |
|
|
12.2 Upcoming
construction works schedule in the coming months |
15 |
|
|
|
|
|
|
|
|
|
APPENDIX |
|
|
|
Organization Chart
and Lines of Communication |
|
|
|
Calibration
Certificates for Impact Air Quality Monitoring Equipment |
|
|
|
Impact Air Quality
Monitoring Results |
|
|
|
Graphical Plots of
Impact Air Quality Monitoring Data |
|
|
|
Calibration
Certificates for Impact Noise Monitoring Equipment |
|
|
|
Impact Noise
Monitoring Results |
|
|
|
Graphical Plots of
Impact Noise Monitoring Data |
|
|
|
Data of Weather
Station |
|
|
|
Event-Action Plans |
|
|
|
Construction
Programme |
|
|
|
Summary of
Implementation Status of Mitigation Measures during Site Inspection |
|
|
|
Figure for the
Change of Air Monitoring Station A2 at Tung Shing Store |
|
|
|
|
|
|
Drawing No.
23400/EN/098 |
Ngong Ping Sewage
Project Scheme – General Layout |
|
Drawing No.
23400/T/010 to 018 |
Portion of Site and
Works Area (Sheet 1 to Sheet 9) |
|
Drawing No.
23400/R/004 |
Air & Noise
Sensitive Receivers around Ngong Ping Area |
|
Drawing No.
23400/EN/094 |
Locations of Noise
and Dust Monitoring Stations |
|
|
|
|
Tables |
|
|
2.1 |
Contact Details of
Key Personnel |
|
4.1 |
Air Quality
Monitoring Equipment |
|
4.2 |
Monitoring
parameters, duration and frequency of impact air quality monitoring |
|
4.3 |
Air Quality
Monitoring Locations |
|
4.4 |
Monitoring Schedule
for air quality monitoring stations |
|
4.5 |
Action and Limit
Levels for 24-hr TSP and 1-hr TSP |
|
5.1 |
Noise Monitoring
Equipment |
|
5.2 |
Duration,
Frequencies and Parameters of Noise Monitoring |
|
5.3 |
Noise Monitoring
Locations |
|
5.4 |
Monitoring Periods
for noise monitoring stations |
|
5.5 |
Action and Limit
levels for noise monitoring |
|
8.1 |
The summary of the
site inspection findings and Action(s) taken by KLKJV and ET |
|
8.2 |
Summary of
Environmental Licensing and Permit Status |
|
9.1 |
Summary of
Quantities of Waste for Disposal in this reporting month |
|
10.1 |
Statistical Summary
of Environmental Complaints |
|
12.1 |
Upcoming EM&A
Schedule in coming two months |
|
12.2 |
Construction Plan in
the coming months |
|
|
|