TABLE OF CONTENTS

 

Executive SUMMARY

 

1.

INTRODUCTION

1

 

 

 

2.

PROJECT INFORMATION

 

 

2.1 Background

1

 

2.2 Site Description

2

 

2.3 Construction Programme

2

 

2.4 Milestones of Environmental Protection / Mitigation activities annotated

2

 

 

 

3.

Baseline Air Quality Monitoring

 

 

3.1 Monitoring Requirement

3

 

3.2 Monitoring Equipment

3

 

3.3 Monitoring Parameters, Frequency and Duration

3

 

3.4 Monitoring Locations and Period

3 – 4

 

3.5 Monitoring Methodology

4 – 5

 

3.6 Results and Observations

5 – 6

 

3.7 Action and Limit levels

5 – 6

 

 

 

4.

Baseline Noise Monitoring

 

 

4.1 Monitoring Requirement

6

 

4.2 Monitoring Equipment

76

 

4.3 Monitoring Parameters, Frequency and Duration

76

 

4.4 Monitoring Locations and Period

6 – 7

 

4.5 Monitoring Methodology

7 – 8

 

4.6 Results and Observations

8 – 9

 

4.7 Action and Limit levels

98

 

 

 

5.

Revision for inclusion in the updated em&a manual

9

 

 

 

6.

CONCLUSION

9 – 10