Page

TABLE OF CONTENTS

 

Executive SUMMARY

 

1.

INTRODUCTION

1

 

 

 

2.

PROJECT INFORMATION

 

 

2.1 Background

1

 

2.2 Site Description

2

 

2.3 Construction Programme

2

 

2.4 Milestones of Environmental Protection / Mitigation activities annotated

2

 

 

 

3.

Baseline Air Quality Monitoring

 

 

3.1 Monitoring Requirement

3

 

3.2 Monitoring Equipment

3

 

3.3 Monitoring Parameters, Frequency and Duration

3

 

3.4 Monitoring Locations and Period

3 – 4

 

3.5 Monitoring Methodology

4 – 5

 

3.6 Results and Observations

5 – 6

 

3.7 Action and Limit levels

5 – 6

 

 

 

4.

Baseline Noise Monitoring

 

 

4.1 Monitoring Requirement

6

 

4.2 Monitoring Equipment

76

 

4.3 Monitoring Parameters, Frequency and Duration

76

 

4.4 Monitoring Locations and Period

6 – 7

 

4.5 Monitoring Methodology

7 – 8

 

4.6 Results and Observations

8 – 9

 

4.7 Action and Limit levels

98

 

 

 

5.

Revision for inclusion in the updated em&a manual

9

 

 

 

6.

CONCLUSION

9 – 10

 

 

 

 

 

 

 

 

 

APPENDIX

 

A1

Calibration Certificates for Baseline Air Quality Monitoring Equipment

 

A2

Baseline Air Quality Monitoring Results

 

A3

Graphical Plots of Baseline Air Quality Monitoring Data

 

B1

Calibration Certificates for Baseline Noise Monitoring Equipment

 

B2

Baseline Noise Monitoring Results

 

B3

Graphical Plots of Baseline Noise Monitoring Data

 

C

Data of Weather Station

 

D

Updated Construction Programme

 

 

 

 

 

Figure

 

Drawing No. 23400/EN/098

Ngong Ping Sewage Project Scheme – General Layout

Drawing No. 23400/T/010 to 018

Portion of Site and Works Area (Sheet 1 to Sheet 9)

Drawing No. 23400/R/004

Air & Noise Sensitive Receivers around Ngong Ping Area

Drawing No. 23400/EN/094

Locations of Noise and Dust Monitoring Stations

 

 

 

 

Tables

 

3.1

Air Quality Monitoring Equipment

3.2

Monitoring parameters, duration and frequency of baseline air quality monitoring

3.3

Dust Monitoring Station and Location

3.4

Monitoring periods for dust monitoring stations

3.5

Summary of 24-hr and 1-hr TSP monitoring results (Please include the date of monitoring in the x-axis of the charts)

3.6

The criteria of Action and Limit levels for air quality

3.7

Action and Limit levels for 24-hr TSP and 1-hr TSP

4.1

Noise Monitoring Equipment

4.2

Noise Monitoring Station and Location

4.3

Monitoring periods for baseline noise monitoring stations

4.4

Summary of baseline noise monitoring results

4.5

Action and Limit levels for noise monitoring