CONSTRUCTION OF JETTY AT LUNG KWU CHAU

(CED CONTRACT NO.: CV/2002/11)

BASELINE MONITORING REPORT

(18 APRIL TO 16 MAY 2003)

REVISION 1

 

View Full-Sized Picture

View Full-Sized Picture

 

TABLE OF CONTENTS
Executive Summary
1 INTRODUCTION
 
2 PROJECT INFORMATION
2.1 Background
2.2 Project Location and Scope
2.3 Construction Programme
 
3 Baseline Marine Water Quality Monitoring
3.1 Monitoring Locations
3.2 Monitoring Parameters
3.3 Monitoring Frequency
3.4 Monitoring Methodology and Equipment Used
3.5 Quality Assurance (QA) / Quality Control (QC) results and Determination Limits
3.6 Details of site Equipment used for In-situ measurement
3.7 Monitoring Duration and Period
 
4 Results and Observations
4.1 Results
4.2 Observations
 
5 Revision for inclusion in the EM&A Manual
 
6 CONCLUSIONs and Recommendations
 
APPENDIX
A Calibration Certificates of Basline Monitoring Equipments
B1 Field Records of Baseline Monitoring
B2 Baseline Monitoring Results
C Graphical Plots of Baseline Monitoring Data
D Weather Condition during Baseline Monitoring
E Construction Programme of the Project
F Statistical Analysis of difference between Control and Impact Stations
G QA/QC Results of Laboratory Analysis
 
Figure
Figure 1 Construction of Lung Kwu Chau Jetty
TS-2031 Proposed Marine Water Quality Monitoring Stations
 
Tables
3.1 Proposed Marine Water Quality Monitoring Stations
3.2 Monitoring Parameters
3.3 Other relevant water quality parameters
3.4 Monitoring Frequency of Baseline Monitoring
3.5 The Summary of Testing Procedures
3.6 Details of Baseline Monitoring Equipment (In-situ measurement)
3.7 Schedule for Baseline Monitoring at Lung Kwu Chau
4.1 Summary Statistics of Baseline Monitoring Parameters at Lung Kwu Chau
4.2 Action and Limit Levels for Marine Water Quality
4.3 Action and Limit Levels for Marine Water Quality at Lung Kwu Chau